Skip to content

Urban Planning + Design UPD 312 Student Work

Search
  • Planning for Biking and Walking at UMKC
  • Privacy Policy
  • The North Loop as Transit Hub
  • Urban Planning + Design at UMKC
  • Urban Planning + Design Studio II
  • Valentine Neighborhood Studio 2026
Uncategorized

Armour BLVD to 39th Street / Baltimore to Walnut

February 24, 2017 Sean Thomas

Armour Blvd to 39th Street (Sean Thomas)

This document displays some of the changes in typology along the Main Street corridor over time in Kansas City Missouri.

Post navigation

Previous PostHistorical Analysis: Transit-Oriented Development on MainNext PostStreet Elements: Signage

Displays student work in UPD 312

Recent Posts

  • Existing Conditions + History of Transportation March 7, 2026
  • Valentine’s Existing Condition(s) March 5, 2026
  • Housing March 4, 2026
  • Existing Conditions Report March 3, 2026
  • Historical Figure Grounds February 19, 2026
  • Census Research February 19, 2026
  • Valentine Introduction February 19, 2026
  • Historic Figure Grounds: 40th to Archibald, Central to Clark February 18, 2026

Recent Comments

  • frischm on History and Context blog of the North Loop – Chris Morales
  • frischm on Population boost on troost
  • frischm on Why Mobility Hubs
  • Annamarie Weddle on Why Mobility Hubs
  • Frostbite45 on Why Mobility Hubs
  • Benjamin Bachwirtz on The Jacobs/Whyte Formula for Great Parks (and How KCMO Complicates It All)
  • Drew Pearson on The Jacobs/Whyte Formula for Great Parks (and How KCMO Complicates It All)
  • Luisa Calumpong on 63rd Street from the 1940 vantage point.

Archives

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

63rd Street Corridor 2019

Privacy Policy Proudly powered by WordPress