Construction Update: Bixby Lane Closure

By , October 23, 2015 12:54 pm

Construction UpdateBixby Lane will close to vehicular traffic beginning October 27 and will reopen sometime around November 19 so that we can rework the concrete walk on the north side of the oval drive.  We will be able maintain all pedestrian access around this space for those going to and from the west side of campus.

Bixby Lane is the one-way street exiting the parking lot shared by the Performing Arts Center and the Atterbury Student Success Center.  It directs traffic onto Cherry Street near the parking structure.

Leave a Reply

You must be logged in to post a comment.

Panorama Theme by Themocracy