Energy

Voluntary Energy Management Campaign

Join your UMKC friends and colleagues and take the pledge to save energy!

See our collective energy savings impact and encourage others to take the pledge.

Energy Management History

In 2007, Burns & McDonnell Engineering entered into a performance contract with UMKC to design and build energy-saving features for existing and future buildings. This contract pays for itself with the savings from such measures as efficient lighting, improved exhaust air and lab controls, water-conserving plumbing, and night set-backs for heating and cooling. The partnership yielded impressive results:

Goals

  • Continue to monitor energy use
  • Investigate newer, cleaner technologies
  • Continue to retrofit buildings with energy-saving upgrades
  • Explore more options with KCP&L
  • Develop reduced rate structures and peak demand load shedding
  • Take advantage of KCP&L’s current rate case and Iatan II project
  • Total annual savings: $1,6000,000

Accomplishments

2007-2012

June 2007

  • Revenue Bond Finance an Energy Performance Contract with Burns & McDonnell Engineering
  • Financed the total cost of $19,675,027 from energy savings within a 15-year period

March 2006

  • Entered natural gas energy marketing agreement with Oneok Energy Marketing
  • Purchased interruptibility natural gas at a significant savings to the campus
  • Ripple Glass UMKC Partners